• GenosseFlosse@feddit.org
    link
    fedilink
    English
    arrow-up
    3
    ·
    edit-2
    1 month ago

    In highrises with lots of stops and users, it uses some more advanced software to schedule the optimal stops, or distribute the load between multiple lifts. A similar concept exists for HDD controllers, where the read write arm must move to different positions to load data stored on different plates and sectors, and Repositioning the head is a slow and expensive process that cuts down the data transfer rate.

    • HugeNerd@lemmy.ca
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 month ago

      This requires little more than a 286. It’s an elevator. Responding in times measured in seconds. What kind of computations do you think are required here? Imaginary quaternion matrixes? Squared?

      • GenosseFlosse@feddit.org
        link
        fedilink
        English
        arrow-up
        4
        ·
        1 month ago

        Yes, but if you have it as a Windows program it’s easier to configure on a screen with mouse and keyboard, change settings, display help files or give the source code to someone else to make changes or add features.