No functioning rail system
Has largest railroad network in the world
Pick one or specify you mean passenger rail.
No functioning rail system
Has largest railroad network in the world
Pick one or specify you mean passenger rail.
As much as I hate to say this, MDMA being used for treatment of mental illnesses might not be viable option because of it’s negative effects. I do not know if short term severe depression and long term memory loss is worth a reduction in PTSD. Maybe as a last resort medication similar to how methamphetamine is prescribed for drug resistant ADHD.
Anyone who develops or sells nuclear weapons and anyone holding stock in those companies (former advisor or not) benifits from the testing of nuclear weapons.
Defense contracts include the costs of R&D which is why they are so lucrative for a business to take. By testing nuclear weapons those companies holding the contracts can bill us the taxpayers for their tests. To put in other words for every nuke they test is somewhere from 20 million to 100 million of taxpayer money going to a defense contractor pocket.
How are the payload weights between pickup trucks and Zeppelins different then?
I am comparing payload weights because it’s directly comparable between all vehicles. I am not sure if you understand payload weight fully. This is the rating for everything you put in the vehicle (airship or not) and includes everything from people to the trailers tounge if you are towing. Just because your truck can tow 20Klb does not mean you can exceed the payload capacity. A lot of first time RV buyers learn this the hard way when they buy a 10Klb trailer to tow with their 2018 F150 only to find out there isn’t even enough payload capacity left over for the driver because the tounge weight is 1000lb. Air ships (and aircraft for that matter) use the same payload capacity calculations where again anything put inside the vehicle counts towards the payload including people. This is why we can directly compare the two vehicles payload capacity.
Towing capacity isn’t really apples to apples which is why I used payload capacity which is more directly comparable. Don’t get me wrong though I’d love to see an airship towing a trailer.
We are really going to have to wait for the FAA’s investigation because there’s still all sorts of questions about their acquisition process and where exactly was the certificate forged. The big question i have thought was when did spirit discover that the certificates were forged because they are claiming parts manufactured all the way back in 2019 were effected. I believe some suspicion on the side of spirit is warranted because this is the same company that is currently being investigated on claims that they were covering up safety issues. Not to speculate too much but I wouldn’t be surprised if spirit knew the titanium was fraudulent as early as 2019 and are only now doing something about it because they are being investigated for other issues and wanted to control the narrative.
The problem is it’s actually is sorta Boeing’s fuck up here. The questionable source titanium was caught at spirit aerospace who manufactures parts for Boeing and airbus. Spirit aerospace was originally a Boeing factory that was spun off into its own company in 2005 in one of Boeing idiodic stock pump schemes. Boeing on paper does not have control over spirit aerospace but all of spirit’s leadership came from Boeing with their CEO having worked for Boeing for 31 years. Boeing also has a lot of pull inside spirit being their largest customer by a significant margin. Boeing is currently in talks of buying back spirit aerospace to fix the mess they got themselves into.
Under very specific circumstances what circumstances? The DEA’s regulations is pretty cut and dry. A patient can request the transfer of a schedule II prescription on a one-time basis.
Also how is it that “the majority of pharmacies do not have the appropriate functionality within their software to do so.” when NCPDP’s SCRIPT standard version 2017071 has that feature according to the DEA and NCPDP and version 2017071 is required if a pharmacy accept Medicaid which a CDC paper says is 90% of pharmacies outside of small rural areas…
Edit: just would like to point out that this proves my original point about pharmacist not understanding the rules of schedule II prescriptions.
While others suggested adding the DNS records manually the far more secure and easier in the long term solution is to run pihole with unbound. Going this route completely eliminates third party upstream DNS servers as unbound will query the top level domain for their authoritative name server and direct the IP address from the source. Pihole has a great explanation on their website. I like crosstalk solutions on setting it up as it’s has everything you need just to copy paste your way into it working.
I really hope Pharmacist and doctors take the CDC’s recommendations seriously because it’s the complete opposite right now especially with pharmacy/pharmacist. The fact the CDC has to remind the pharmacist that you can transfer a schedule ii medication is really sad. There are way too many Pharmacists out there who like to hold your prescription hostage when they are out because “you might be a drug seeker”.
wanted to implement something like that with my 1920R UPS for my rack but haven’t found the time to commit to antiquated hardware.
Was enough of a hassle dealing with the expired SSL certs on the management card yet getting software running on one of my machines to communicate with the UPS.
Honestly you should just bypass dells management software and use NUT. It supports your UPS’s management card if you enable SNMP or you can bypass it all together and just run off of the USB/serial.
All things considered my two servers chilling chew around 60w on average, not taking into account my POE cameras or other devices. The UPS should run for over a day without getting close to draining its batteries (have a half populated ebm too).
I’m pretty surprised I can run my whole network for an hour off of my 1500va UPS with three switches and a handful of POE devices. I’m still thinking about replacing it with a rack mount unit so i can lock it inside my rack as I’ve been having issues with unauthorized people messing with it.
I personally use an APC pro 1500 and it will run my (admittedly large) network for an hour. If your router and modem are around 50 watts you could probably get about two hours.
If you need anything longer than that you should look at solar generators that have an UPS mode like from what bluetti or ecoflow offers as they are a significantly better value than a purpose built high capacity UPS with the added benefits of being able to hook up portable solar panels to extend the run time even further.
I think the safe option would be to use a smart UPS and Network UPS Tools to shutdown the LLM virtual machine when it’s running on battery. I do something similar with my NAS as it’s running on an older dell R510 so when the UPS goes onto battery it’ll safely shut down that whole machine to extend how long my networking gear will stay powered.
The biggest advancement they made was making it smaller. Zeppelin NTs are a fraction of the size of what Ferdinand von Zeppelin was designing in his day. Because of their smaller and the switch to helium Zeppelin NTs has a miniscule payload capacity at 4200 pounds. To put that into perspective that’s the same payload capacity as a Ford F250. Even with their reduced surface area and modern flight controllers controllers the Zeppelin NTs still haven’t solved the weather issue as they are restricted from flying in winds greater than 22MPH and when VFR is not available.
Titanium is such a unique metal to machine that anyone could tell if it wasn’t actually titanium. The only way you could get away with passing off another metal as titanium is if you had a massive fraud conspiracy spanning from the contractors/subcontractors all the way up to the aerospace manufacturers. Not to say it would be impossible but there would need to be a lot of corrupt people involved.
Since you didn’t explain why… Using a normal power bank as an UPS is a bad idea because lithium batteries have a limited amount cycles it can charge and discharge. With a power bank the power has to flow from the charger into the battery then out to the load which eats up those cycles. An UPS is a little more clever as the power goes straight to the load via a capacitor bank and a mosfet bypassing the battery. When the source power is cut the UPS runs off of the capacitors for the milliseconds it takes for the mosfet to switch the load over to the battery. This vastly extends the life of the battery and reduces the risks of fire and toxic fumes from being released.
if you look at the history of what happened to each Zeppelin airship you get a really good idea why it’s a bad idea.
LZ1: damaged during initial flight, repaired and flown two more times before investors backed out causing the ship to be sold for scrap.
LZ2: suffered double engine failure and crashed into a mountain. While anchored to the mountain awaiting repairs a storm destroyed it beyond repair.
LZ3: built from salvaged parts of LZ2. Severally damaged in storm. After LZ4’s destruction LZ3 was repaired and was accepted by the German military who eventually scrapped it.
LZ4: suffered from chronic engine failure. While repairing the engines a gust of wind blew the ship free of its mooring and struck a tree causing the ship to ignite and burn to the ground.
LZ5: destroyed in a storm.
LZ6: destroyed in its hanger by fire.
LZ7: destroyed after crashing in a thunderstorm.
LZ8: destroyed by wind.
LZ9: this one actually worked and survived for three years before being decommissioned.
LZ10: caught on fire and destroyed after a gust of wind blew its mooring line into itself.
LZ11: destroyed while attempting to move the ship into it’s hanger
LZ12 & LZ13: both flew successful careers before being decommissioned a few years later.
LZ14: destroyed in a thunderstorm.
LZ15: destroyed during an emergency landing.
LZ16: was stolen by the French. ***
LZ17: decommissioned after the war.
LZ18: exploded during its test flight.
LZ19: damaged beyond repair during an emergency landing.
LZ129: the Hindenburg.
LZ127: retired and scrapped after flying over a million miles.
LZ130: flew 30 flights before being dismantled for parts to aid in the war effort
The problem is with airships and aerostats in general is you need a massive balloon just to lift a small amount of weight but the larger you make it the more susceptible to weather it ends up being. With the amount of surface area a balloon that’s a 1km long has you would have to spend a considerable amount of energy just to stop it from blowing away in the wind, as inefficient as it is the truck may actually use less fuel because of this.
Pre roll and post roll ads would be pretty easy to detect since the length of the actual video is fixed. Mid roll ads though will need something more clever.
Y’all can down vote me all you want but it still won’t change the fact the United States has a functioning railroad system outside of passenger service. I only mention network size because it was the easiest metric to pull up. But the point is whatever metric you use outside of passenger service the US is in the top three countries which is something not possible unless you have a functioning railroad system.
The US is third for tonnes per kilometer.[1]
The US is second for tonnes hauled per year.[2]
The US moves more intermodal containers by rail then all of Europe combined. [3]
It might seem like the United States doesn’t know how to run trains but in reality we have one of the best freight networks out there.
I’d also like to add that on the passenger side of things the US is really trying to improve but the investments haven’t had time to come to fruition yet. Amtrak has 768 siemens venture cars and 175 ALC-42 locomotives on order so it can expand to 39 new routes [4]. There’s been a significant amount of funding into high speed rails for other corridors outside of the northeast corridor [5].