  • 2026-11-02 addendum:

    • Photo of B25’s common dome before it entered Megabay 1. (RGV Aerial)

    2026-11-04 addenda:

    • Massey’s: The second reaction frame was removed from the nosecone crush structure at Massey’s. (ViX)
    • Launch site: Scaffolding was removed from the Pad 2 launch mount, and the booster quick disconnects performed extension and retraction tests. (ViX)
    • The Pad 2 deluge was tested twice, simulating launch and booster catch. (ViX, RGV Aerial)
    • Pad 2 chopsticks testing was also observed. (ViX, RGV Aerial)
    • A section of rebar at the cryo offload area was relocated by several humans. (ViX)
    • Production site: The tall LR13000 (1300?) crane was shortened. (ViX, cnunez)
    • B25’s A3:4 section was moved from Starfactory to Megabay 1. (ViX)

    2026-11-05:

    • Launch site: Some of the pipes for Pad 1 the deluge system are moved. (ViX)
    • A ramp section of the Pad 1 flame trench is lifted into position. (ViX)
    • The Pad 2 deluge system is tested once. (NSF, ViX)
    • Production site: Construction between the Gigabay (TX) and Starfactory continues. (ViX)
    • S45’s A3:4 section is moved from Starfactory to Megabay 2. (ViX)
    • McGregor: R3.2x9 leaves the testing area. (ringwatchers)
    • Florida: LC-39A deluge system is tested twice, simulating launch and booster catch. (NSF)
    • Upcoming flights: Flight 15 is now NET Nov 13th, and flight 16 is now NET Dec 10th. (Avid Space, compass.atfm.aero, archive, Dontchev via Berger)