This week, New Jersey ordered the operator of one of the East Coast’s largest planned data centers to pay a $1.1 million fine for secretly installing and operating gas generators in violation of the state’s Air Pollution Control Act.

  • skankhunt42@lemmy.ca
    link
    fedilink
    English
    arrow-up
    66
    ·
    1 month ago

    I’ll bet anything they budgeted for a fine and it was still cheaper than doing it the proper way. Whoever signed the paper to approve the install should be on the hook personally.

    • Carmakazi@piefed.social
      link
      fedilink
      English
      arrow-up
      55
      ·
      1 month ago

      NJ should have Public Works seize all of the offending generators with NJSP as backup. No warning, no compensation. Corporate lawlessness like this needs to stop being profitable.

      • Dultas@lemmy.world
        link
        fedilink
        English
        arrow-up
        19
        ·
        1 month ago

        Compounding fines. If they’re not gone in a week double it and fine them again. Continue until they’re removed.

      • Nooodel@lemmy.world
        link
        fedilink
        English
        arrow-up
        14
        ·
        1 month ago

        This. They are installed without permit, they will be uninstalled without warning.

    • pageflight@piefed.social
      link
      fedilink
      English
      arrow-up
      5
      ·
      1 month ago

      We need to stop fining and start taking away privileges. Sorry, you can’t buy/build any fossil fuels any more.

      • madcaesar@lemmy.world
        link
        fedilink
        English
        arrow-up
        7
        ·
        1 month ago

        I want the board / ceo to do prison time for shit like this, as well as the contractors that execute the illegal work

  • TrackinDaKraken@lemmy.world
    link
    fedilink
    English
    arrow-up
    35
    ·
    edit-2
    1 month ago

    the [62] “tractor-trailer-size” generators were “impossible to miss” and certainly were not there when inspectors last visited in December 2025.

    Each one of the generators cost roughly $1 million. With shipping, installation, etc. the total was probably north of $100 million for these generators.

    So, they were fined less than 2% of what it cost them to have these installed. Pocket change, indeed.

      • NOT_RICK@lemmy.world
        link
        fedilink
        English
        arrow-up
        13
        ·
        1 month ago

        Instead they’re allowed to run them while they apply for the permit they didn’t follow through on. What a fucking joke

      • October@lemmy.world
        link
        fedilink
        English
        arrow-up
        8
        ·
        1 month ago

        “You have 30 minutes to remove your generator.”
        “You have ten minutes.”
        “Your generator has been impounded.”
        “Your generator has been crushed into a cube.”
        “You have 30 minutes to move your cube.”

      • CheeseNoodle@lemmy.world
        link
        fedilink
        English
        arrow-up
        3
        ·
        edit-2
        1 month ago

        Donate em to Ukraine, these things sound perfect for temporary emergency energy relief after strikes on infrastructure.

    • Jesus_666@lemmy.world
      link
      fedilink
      English
      arrow-up
      11
      ·
      1 month ago

      Fine them one million a day until the generators are done. That should motivate them a bit more.

      • Kissaki@feddit.org
        link
        fedilink
        English
        arrow-up
        6
        ·
        1 month ago

        They were already in violation. The days should count from the day they were installed, or from the earliest day it was confirmed as not yet installed.

  • Wispy2891@lemmy.world
    link
    fedilink
    English
    arrow-up
    20
    ·
    1 month ago

    I feel that only 1 million is a fraction of what they would had to pay if they had to produce the certifications and documentations for getting the permissions for the 62 turbines

  • Gerudo@lemmy.zip
    link
    fedilink
    English
    arrow-up
    8
    ·
    1 month ago

    I’m sure they totally turned off those turbines right? So they keep getting fined each day right?

  • Treczoks@lemmy.world
    link
    fedilink
    English
    arrow-up
    8
    ·
    1 month ago

    Does the order also include removing the gas generators, or is it just cost of doing business?

    • Zarxrax@lemmy.world
      link
      fedilink
      English
      arrow-up
      14
      ·
      1 month ago

      DataOne was given 45 days to apply for the permits or else cease operations, but they can continue operating the gas engines while seeking permits.

      • TronBronson@lemmy.world
        link
        fedilink
        English
        arrow-up
        3
        ·
        1 month ago

        I’ve worked in construction most of my life and I always wonder how code enforcement will come down hard on small projects and do nothing about larger ones. This is a local government issue, and the locals write the laws….

  • kat_angstrom@lemmy.world
    link
    fedilink
    English
    arrow-up
    3
    ·
    1 month ago

    If it’s punishable by a fine, it’s legal for a fee. We need jail time for CEOs, not paltry tickets

  • DanceMomsSavedMe@lemmy.zip
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 month ago

    You guys remember in I think Nice Dreams with Cheech and Chong where they put up the blue tarps over the plants and he acted like he was swimming?

    I bet they start using tarps or building buildings around them to start hiding this kind of stuff.